concrete mix design for M 30 Grade
Answers were Sorted based on User's Feedback
Answer / maharshi
grades more than M25 should consists of mix designs so for
M30 grade mix design is necessary
| Is This Answer Correct ? | 58 Yes | 15 No |
Answer / tushar patel
AS per IS:456-2000,Concrete grade above M25 has to be
designed mix.for such higher grade W/C ratio,quality of
aggregates,admixtures are equaliy important parameters.So
M30 can never be designed in volumetric batching if
consistent quality control & strength is desired.
| Is This Answer Correct ? | 29 Yes | 4 No |
Answer / ramamurthy k l
Mix Design There are two types 1) Nominal mix
2)Design Mix
Nominal mix based in volume nad experience
Proportion 1:1.5:3
Design mix done using IS 10262 Code based on properties of
all ingredients ie sand aggregate water and cement finall
we are going arrive mix proportion in Wt.
| Is This Answer Correct ? | 43 Yes | 21 No |
Answer / eleyaraja
cment 390
20.00mm = 650
12.5mm = 450
river sand = 900
water =170
| Is This Answer Correct ? | 26 Yes | 14 No |
Answer / soumya
Cement = 7.5 bags ( as per the cement content given 375
kg/m3)
sand content =0.45 m3
aggeregate =0.92 m3
| Is This Answer Correct ? | 19 Yes | 19 No |
Answer / ashalatha y
Proportion: 1:1:2
Quantity of Cement= 1440*0.92*2/4
=662.4 Kgs
=13.248 Bags
=13.5 or 14 Bags can be taken
| Is This Answer Correct ? | 39 Yes | 70 No |
Answer / deven bhat
1:1:2 is the logical mix design randomly used in mumbai &
costal part of india
cement consumption will be 500 kg for a M3 and water
requirement will be 300 ltrs for M3.
| Is This Answer Correct ? | 47 Yes | 86 No |
cinder filling or Brick Aggregate filling in sunken portion.which one is better
1 Answers Chenab Valley Power Projects,
what is the formula to calculate costing of rubble soling and wbm in road works?
how many stones require for rr masonery work 1cum.
minimum spacing of bars in column????as per code...???
7 Answers PNC, Rajesh Associates,
which Indian standerd code is used for billing
4 Answers Desai Construction, DLF, NKG Infrastructure,
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
which is cover of r.c.c. column,beam and slab
100sqft of 9" (brickwork).. bricks(standard)=no ? sand= cement=
what values & beliefs have guided you in your career path
Can fly ash bricks can be used in brick bat coba?
How much steel needed for 1 m3 concrete for slab?
Isolated square footing quantity calculations
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)