manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm
and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
No Answer is Posted For this Question
Be the First to Post Answer
What is braced excavation all about?
Cement sand mortar ratio 1:6 and 1:3. In canal lining 10mm & 16mm respectively done after 24hrs difference between them . Tell me Torrence limit of above ratio after 1 Year .
what is the status of Brick & cube testing
How to calculate the quantity of water in cement mortar eg. CM 1:3?
all technical question
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
What is a BBS?Find out the cutting length for a 600*600 foundation with 50 mm cover
i m searching for steel or rebar weight/meter (d)2/162 this is correct but why used here 162
in 1:4,1:6 and 1:8 cement mortar mix how much water required? and find water cement ratio?
What is difference between FE-415 and FE-500???
Find out the Cutting Length of Closed Hoop 2 Legged Stirrups for Beam as mentioned. Beam Size :200x300 mm,Nominal cover for all sides :25 mm,8 mm dia. Fe415/500/550.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)