Answer Posted / eleyaraja
cment 390
20.00mm = 650
12.5mm = 450
river sand = 900
water =170
| Is This Answer Correct ? | 26 Yes | 14 No |
Post New Answer View All Answers
what could be the production cost of 1 cum of concrete by CP30 plant
use ofr concrete as per grade ?
how to shuttering is used in slab
What is diversion tunnel in a dam?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
what is anchorage length,lap length and (dont remember the last one)
can you give me the details of rate analysis of steel and concrete?
What are the responsibilities of a site manager?
How to cal. The weight of hollow pipe?
what is the difference between tsp & tower
Slump Values for works?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
what is your role of in previous company as a construction manager
How to calculate quantity of plum masonry in 1:3:7