concrete mix design for M 30 Grade

Answer Posted / deven bhat

1:1:2 is the logical mix design randomly used in mumbai &
costal part of india
cement consumption will be 500 kg for a M3 and water
requirement will be 300 ltrs for M3.

Is This Answer Correct ?    47 Yes 86 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate the crank rod in slab

1899


what do you know that m20,m25

1405


What is the likely strength of a 1:2:4 concrete mix?

677


How much for the BRC lapping in full yield and half yield < and which table to get it ?

2037


how can we construct building without foundation providing only grade beam at ground level

1075






2. What are the advantages of your present job, things you like about it?

2717


Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000

1230


How to find out kg per Sft ?

1812


Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.

2512


What are new methods /technologies of pothole patching?

1890


a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula

1225


What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?

1979


How much cum. Brick work can do by 1 madon

1187


Explain how you can turn off the display for dimension in CAD?

721


Explain soil analysis?

669