Answer Posted / tushar patel
AS per IS:456-2000,Concrete grade above M25 has to be
designed mix.for such higher grade W/C ratio,quality of
aggregates,admixtures are equaliy important parameters.So
M30 can never be designed in volumetric batching if
consistent quality control & strength is desired.
| Is This Answer Correct ? | 29 Yes | 4 No |
Post New Answer View All Answers
how do we design mix ratio?
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
Define a polyline?
What is specific gravity???
What is the cost difference between site mix and ready mix concrete per cubic meter
What is aggregate?
What is construction mitigation management?
What you understand by building codes?
How to marking the building
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
cause of cylinder test failure
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
The foundations are placed below ground level, to increase?
What is the snap size in civil and how can we create it?