For 15mm Thick Cement Plaster:
In CM 1:3 cement Consumption is 8.772 Kgs/Sqm (0.172*510)
Sand is 0.18404 Cum/10Sqm (0.172*1.07 per 10 Cum)
In CM 1:4 cement Consumption is 6.536 Kgs/Sqm (0.172*380)
Sand is 0.18404 Cum/10Sqm (0.172*1.07 per 10 Cum)
Is This Answer Correct ? | 2 Yes | 13 No |
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
Which Types Of Bricks ?
What are the causes of failure of foundations and remedial measures?
Define a polyline?
How to ascertain the required grade of Steel is good for Site .....
For 1cu.m how many bricks required practically
what is mean by bulking of sand?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
In pile foundation which kind of action are take place?
How to calculate the amount of Brick,cement & sand required for 1 cum of 230mm thick brick work with ratio 1:5 please give me an answer with detailed step
31 Answers Assurance, Design Ideas, Jeno Maran Builders, Lanco, NamPower, NCC, Prime Adhivas Contrats, Simplex, SSM, SSM Builders and Promoters,
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
List out some of the software used in the construction sector to estimate cost and monitoring expenses?