Answer Posted / sandeep kumar
m30=1:1:1
| Is This Answer Correct ? | 9 Yes | 7 No |
Post New Answer View All Answers
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
What is the outturn of Ceiling plastering
Would you cause a 55-gallon drum of water to weigh more by climbing in?
load combinations how many types for staad design purpose?
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
What are the advantages of building a dam on the river nile?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
why is M30 grade Concrete use for Foothing & Column M50
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
Does brick grows bigger every year?