Why Vitrified tile are getting pop up.
No Answer is Posted For this Question
Be the First to Post Answer
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
the volume of 50kg bag is 27 lit 24.7 lit 44.7 lit 42.9 lit
What salary do you expect? to a 10 yrs experienced civil engineer?
per 1 cumt concrete how much manhours is required including shuttring,steel etc.,for slab & foundations
What is "Bending moment"? Demonstrate on theory not for formula.
what is the mix design for M45 concrete
What is the ring size of column 600x400 (8mm dia ring) ?
Why we test compressive strength after 28 days..?
3 Answers NM Caramoan Builders,
plz anyone can tell me how to find the volume of dome whose radius is 3.25mt , height is 1.50mt and thickness is 0.15mt.
Where hinge support is used in residential building?
how many days we should curing for plastering,brickwork,concrete?
10 Answers Al Faraa, Alfaraa, CCCL, Consolidated Construction Consortium Limited, Wipro,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)