I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?

Answers were Sorted based on User's Feedback



I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shut..

Answer / k chiranjeevulu

to remove shuttering after 14 days

Is This Answer Correct ?    32 Yes 6 No

I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shut..

Answer / sasi

after 14 days

Is This Answer Correct ?    17 Yes 5 No

I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shut..

Answer / mahendra mohan srivastava

hallo my dear friendrs
If slab is less then 4.5 m then we remove shuttring after 7
days and if grater then 4.5 m then we remove shuttring
after 14 days not the strength of concrete.

Is This Answer Correct ?    13 Yes 1 No

I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shut..

Answer / koti reddy allu

Hi Veeramani, it's Reddy here. First of all the basic
criteria for De shuttering is 1. Type of formwork i.e.
Vertical Form work for Columns, Soffit form work for
Slabs/Bems etc 2. The Effective Span of the member

Deshuttering period neither depends on Grade nor Depends on
Curing period according to IS 456 - 2000.

Is This Answer Correct ?    9 Yes 1 No

I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shut..

Answer / baskar

7 days

Is This Answer Correct ?    3 Yes 0 No

I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shut..

Answer / nagori salim

Completely depends upon Grade of Concrete

Higher the Grade, Lesser will be the period for deshuttering

Is This Answer Correct ?    7 Yes 6 No

I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shut..

Answer / tanvir , faridabad

it should be removed in 28 days in winters , in summer it
can be open in 22 days

Is This Answer Correct ?    5 Yes 4 No

I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shut..

Answer / veeramani amanthan

what will be the concrete strength attained in 7, 14, & 28
days please clear

Is This Answer Correct ?    2 Yes 1 No

I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shut..

Answer / vipin sharma

As per IS 456:2000, the slab shuttering can be removed
after 3 days but immediate after removal of shuttering
proping of the slab need to be done and for beam the
shuttering can be removed after 7 days subject to proping.
Advisable
slab shuttering removal- 7days
Beam bottom less than 6 meter- 14 days
Beam bottom greater than 6 meter- 21days

Is This Answer Correct ?    3 Yes 2 No

I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shut..

Answer / s.prabhu

as per IS456 Centering deshuttering period is depends upon
the span of the beam / slab.

Span less than or equal to 3m is 14days

Span more than 3m is 21 days.



Regads
S.PRabhu
9901702081

Is This Answer Correct ?    2 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

Quality of first class bricks

4 Answers   HPCL,


 What is difference between limit state and working stress method? How it is applies in building structure.

0 Answers  


What are the applications of modulus of elasticity?

0 Answers  


what will happen if one could not properly follow the spacing of slab reinforcement bar?

0 Answers   Yirgalem Construction,


Pl answer. when we deduct 2d for cutting length of 90deg bend, whats the method of booking measurements as per IS code? whether cutting Length to be booked or something else?

2 Answers   Chettinad,






What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet

0 Answers   Tirupati Exim,


What is language of Engineering?

18 Answers   L&T,


how many BSCs can i connect to the HUAWEI MSC

0 Answers  


standared weighs for differnt grade of concrete

10 Answers   Reliance,


What is the compressive strength of noramal clay bricks and AAC bricks??. which one is better for load bearing wall//

2 Answers   College School Exams Tests,


WHEN A RIVER STARTS MENDERING WHAT CONDITION WILL OCCUR?

3 Answers  


if compressive strength on 28day pass, and client is asking core test. is there any thing in standards allows that??

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)