I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / baskar
7 days
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
How to calculate unit weight of concrete for m40 grade.
how to caluclate sienerge qty in construction in ap
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
how do we design mix ratio?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
Explain what is the difference between built area and super built up area?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
List out the potential risk factors for workers on the construction site?
why development length = 50D . why not 100D