why we provide bent up reinforcement bars at l/4 ? if it
is because of diagonal shear , how does it acts ?
No Answer is Posted For this Question
Be the First to Post Answer
What is the proportion of cement agg. and sand for M20,M25 and M30?
How to calculate labor requirement or requirement of labor projction for a proposed multistoried building for which quantities of different items of work has been already calculated stage wise ?
How much 1 cum of M15, M20 & M25 concrete weigh?
How to construct a water sump in a rocky soil?
afe or not
Civil engineering material testing Standard results
0 Answers SUCG Infrastructure,
what is IS
12 Answers GMR, JMC, JMC Projects,
What are the joints wants to made in masonry where door opening, arches like etc..
how to caliculate required amount of cement and sand required for 1cu.m.
How much kilogram of binding wire required for fabricate one Metric ton of reinforcing steel
Project at andheri west mumbai total area of 116000 sq ft near by..Please help me out for quotation plan is ready basic details are with me , please help me out .I will mail u in autocad also.
What is the maximum cement content allowed in RCC?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)