I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / tanvir , faridabad
it should be removed in 28 days in winters , in summer it
can be open in 22 days
| Is This Answer Correct ? | 5 Yes | 4 No |
Post New Answer View All Answers
what is SDLC ?and write a 'c'program for to swapping the three numbers?
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
how water proof chemicals act in concrete to avoid leek?
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
What is Critical path in Ms-Project ?
How can you distinguish between sorption, absorption and adsorption?
what is the water-cement ratio of mix design while 30mpa in 7 days?
Explain the different types of roofing systems?
plz.show development and anchorage length in simple diagram.
What expenses counted in contingencies and how much it is in related to built-up area of the building.
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
why building got air crack? if it get in one particular are what is means?
What are the responsibilities of a site manager?