I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / veeramani amanthan
what will be the concrete strength attained in 7, 14, & 28
days please clear
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
In earth work 1300 cum soil how to calculate how many liters require in water
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
How to calculate volume of concrete & steel on tank foundation & ring wall ?
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
why we can use dust in concrete insted of fly ash
What is critical path method (c.p.m)?
What is the difference between built area and super built up area?
Differentiate orthographic and isometric projections?
What do we mean by partial moment release ??
in plate load test what is the thickness of plate 20mm 5mm 50mm none
What things you need to take care of before building a kitchen island?
how many digree of freedom in four bar chain
what is the clear cover for shearwall?