I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / sasi
after 14 days
| Is This Answer Correct ? | 17 Yes | 5 No |
Post New Answer View All Answers
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
Draw the cross section of a boundary wall and label its part with detailing?
How do we determine the specific gravity of a cement?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
What is limit state method and working stress method and ultimate method
how do you calaculate the total steel quantity of an rcc building using thumb rule?
what is the use of water bar in water tank and is this an extra item in estimate?
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
which steel is better for residential building tmt steel or hysd steel
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
will fix foundation bolts at site with out template is there any procedure?