I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?

Answer Posted / k chiranjeevulu

to remove shuttering after 14 days

Is This Answer Correct ?    32 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Describe Briefly The Various Methods Of Concrete Curing?

693


What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code

1859


In case if concrete box girder bridges how is the number of cells determined?

719


it is a corrected question." make a list of engineering property(properties) of soil.

1606


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

1380






Explain what is alternate bid?

803


Calculation of curtain wall of box culvert

5341


what is the sequence of the activities in the typical under ground water tank including civil & MEP works.

1970


What black man invented the clothes dryer?

697


2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32

1910


Use of coping on terrace wall and in 4" wall is compulsory or not ?

1114


whaat is blister in box girder bridge and what is its function..

4395


the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum

1641


Which brick is best for construction ,either fly ash or AAC BLOCKS

591


what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?

1599