Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?

Answer Posted / k chiranjeevulu

to remove shuttering after 14 days

Is This Answer Correct ?    32 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to arrive dry volume of concrete (1.52 to 1.57) ?

2346


Explain major difference between auto level and dumpy level?

1196


Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?

2116


i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh

2415


strength of bitumen concrete with 80-100 & 60-70 grade bitumen

2119


Define graphics window?

1179


what could be the production cost of 1 cum of concrete by CP30 plant

1708


what"s the sort of beams?

2319


How do you change a dimension value in solidsworks?

1237


How to compute minimum number of columns required for a site from area of site?

2082


Why is the use of granular sub-base in concrete carriageways not preferred, explain?

1262


Define absolute co-ordinates?

1306


will fix foundation bolts at site with out template is there any procedure?

2635


percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters

2140


The 4 main factors to start a construction project are––

2286