SAP Basis (1262)
SAP ABAP (3939)
SAPScript (236)
SAP SD (Sales & Distribution) (2717)
SAP Security (597)
SAP Interfaces (74)
SAP Netweaver (282)
SAP ALE IDocs (163)
SAP Hybris (132)
SAP HANA (700)
SAP PI (Process Integration) (113)
SAP PO (Process Orchestration) (25)
SAP Ariba (9)
SAP Fiori (45)
SAP EWM (Extended Warehouse Management) (58)
Sap R/3 (150)
SAP SolMan (Solution Manager) (63)
SAP MaxDB (116)
SAP GUI (15)
SAP AllOther (329) Describe the change process for material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, engineering change management,revision levels, synchronization with current production orders, other.
1 4887Do you have several alternative BOMs for a material, depending on the manufacturing procedure or lot size, for example (multiple BOM)?
1 4506What structure do your BOMs have? How many levels are there? How many components are there on each level?
1 6066Do your single-level BOMs represent production levels and do you keep your BOM header materials in stock? If not, do you produce non-stock items, or are some assemblies just used as structural elements in a BOM?
2 5330In which context do you use bills of material? [ ] Material Requirements Planning [ ] Execute Production [ ] Goods Movements (to Help Data Entry) [ ] Product Costing [ ] Development/Engineering/Design [ ] Documentation [ ] Others
4 8560In the context of client copy what is customizing data,master data, and application data,and transaction data,etc.. which client copy profile is used for copying each data type? thanks.
2 5717If a tcode is taking too long time to finish and I wand to end the work process in sm50 how to find which work process is currently executing that tcode?
2 8948how much time it takes to export(scc8)a client? how much time it takes for import(can we do this from stms screen or we have to do this from os level?)? how much time it takes for client import post process (scc7)? how much time it takes if we do all this using remote client copy(scc9)? I know it depends on client size and system performance.But I want a real time scenario here. Thanks.
TCS,
1 5538
a cost element is used for some cost center but only in some case like discount allowed particular internal order should be picked? can any one help me?
Enlist the steps involved in the installation of a trial version of sap netweaver.
What are the extractors and mention their types?
1.how can we convert VAT Return Filing in SAP? 2.How can we configure Form "C" report in SAP ?
what are the drawbacks of cubes?
What is the use of message monitoring?
what is direct schedule and what is meta chain
Is there any one who can teach me SAP SD CIN ? I am ready to pay him. Presently I am in PUNE Location. Please Contact me its Urgent - 09987059674, E-Mail ID : sheikhbsa@gmail.com. Possible to me Teaching Location MUMBAI AND PUNE Location.
Give a short description on all sap module?
What is the tool provided by sap for performing sizing of a project ?
Explain users associated with business objects?
How higher level item category is controlled?
How to Raise a Particular Ticket in Realtime ?
Give an example of unit and system testing in sap testing?
Explain sap system transactions?