What structure do your BOMs have? How many levels are there?
How many components are there on each level?
Answer / jinchandra mule
BOM IS A multilevel,
we can assign bom level by level cs11,
level 1 bom header material assembly level,
contains components which also have bom contains
level 2 bom sub assembly level
last lower level is
level 3 components level .
Is This Answer Correct ? | 3 Yes | 0 No |
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
How to create object dependencies in a bom for a configurable material?
Difference between NETCH, NETPL and NEUPL.
What is the significance of order types in PP?
what are all the different manufacturing scenarios in pp?
Explain what is routing in sap pp?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
How does sap know that an operation has components as indicated by the component allocation indicator?
explain BOM usage and status?
what is standard info set? where it is used in pp?
How to delete a group of products that was created in screen mc84 ?
What is MRP procedure