Do you have several alternative BOMs for a material,
depending on the manufacturing procedure or lot size, for
example (multiple BOM)?
Answer / sunil budhwani
yes you can have several alternative BOMs for a material,
only thing is you need to define every BOM with deiffrent
product structure type.
Is This Answer Correct ? | 5 Yes | 0 No |
What do you mean by pooled capacity?
What structure do your BOMs have? How many levels are there? How many components are there on each level?
What is routing in sap pp?
What do you do to run MRP for just one MRP Controller?
Which are the master data relevant for PP module?
What is the t-code for changing production order and to display production order?
what is the need of pp in sap, what is the flow diagram of sap pp.
Explain what is routing in sap pp?
How does sap know that an operation has components as indicated by the component allocation indicator?
what is lead time, planning time, planning fence time ?
How to insert an inspection checkpoint at the end of an operation?
what are the basics of PP ?