Do you want to use one BOM to represent several similar
materials (closed variant BOM)?
Answers were Sorted based on User's Feedback
Answer / sunil budhwani
yes, depand upon qty required to make the prduct for each
BOM.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / gopi
Yes, with one super BOM and component assigned with object
dependecy the BOM components qty can be changed
Is This Answer Correct ? | 0 Yes | 0 No |
Difference between MTO & MTS
1 Answers Cognizant, UT Pumps,
Difference between MD01, MD02 and MD03.
Special Procurement type 40 – proc. form alt. plant
How can we shut off the "automatic costing indicator" and the "automatic scheduling indicator" which go on when the production order is released?
Difference between MD04 and MD05.
Do you use other validity types (such as serial number, time period, or customer) in addition to the "Valid from" date to control the validity of your BOM changes?
If production order released for 100 pieces you done GR for 50 pieces and technically closed, after some days you can do GR for 50 pieces
Mention what is the t-code for changing production order and to display production order?
What is the uses of production scheduling profile and what the configure have you done current project
0 Answers Cognizant, Patanjali Ayurved,
If the scenario is''Party is supplying some material we have to do the some processing operation on it, how it cab be handled in SAP"
What is the output of mps run ?
One work center can assign 2 cost center and one cost can assign to different work center.