Post New Accenture Oracle Service Contracts Interview Questions
What is the difference between int main and void main in c?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
What is array give example?
How and where are aqueducts built?
Define a nested class.
What is the viper?
What are the basic techniques of indexing?
what is features of a typ-ical modern air-conditioning installation?
Which structure used for M100 grade of concrete
Can you list different types of washing faults?
i faced one question. when new configuration we do what is the logic behind there?
Can xcopy move files?
Explain me what is the .net framework and how does it work?
Does a dba have to file taxes?
Describe to the basic elements you put in a defect report?