Post New Accenture Microsoft Related AllOther Interview Questions
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
What is __ doc __ in python?
what are the applications of integrators?
Explain ng-include directive.
What do you mean by component scrap and how is it maintained in sap?
what is dotnet architecture? can anyone explain that.
What is bom?
What are the different types of inner classes?
How do I insert a table in a table in excel?
Does each process scheduler server domain have its own location in the Report Repository?
Is it true that while installing a windows service, an eventloginstaller class is automatically created to install the event log related to the particular service?
What is composer phar?
The Tabula Manufacturing Company has been in business for one month. At the end of month the company had the following accounts: Materials used K 5 000.00 Direct labour 10 000.00 Indirect labour 3 000.00 Indirect materials 2 000.00 Labour fringe benefits 1 000.00 Supervisor’s salary 1 000.00 Depreciation Machinery 2 000.00 Miscellaneous factory overhead 1 000.00 Heat and light 500.00 Insurance on plant 1 500.00 The company processed two jobs during the month with costs as follows: Job 101 Job 102 Materials cost K3 000.00 K2 000.00 Direct labour cost K6 000.00 K4 000.00 Direct labour hours 4 000.00 3 000.00 Machine hours 2 000.00 1 000.00 The company does not use a predetermined rate for factory overhead. The rate is computed at the end of each month. Required Use both the direct labour hours and machine hours to compute: 1) The overhead rates for the month (5 pts) 2) The overhead cost for each job (5pts) 3) The total cost for each job (10 pts) 4) Briefly describe the difference between Job order and process costing, citing relevant examples (5 pts).
Name 5 different addressing modes?
What is linq and why use it?