Answer / kishore kumar
Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will
be
= 2x1.7x0.15 + (0.5-0.15)/3 x ((0.3x0.3+2.0x1.7+sqrt
((0.3x0.3)(2.0x1.7))
=0.981 m^3
| Is This Answer Correct ? | 98 Yes | 37 No |
Answer / vishal gajjar
h(=D-d)\3 * A1+A2+SqrtA1A2 = Q1
A1*A2*thickness = Q2
Q = Q1 + Q2.
| Is This Answer Correct ? | 40 Yes | 11 No |
Answer / suresh,trichirapalli
Q1=2.1*1.7*0.5
Q2=(0.5-0.15)/3*((A1+A2)+(SQRT A1*A2))
A1=Area of bottom portion
A2=Area of top portion
TOTAL QTY=Q1+Q2
| Is This Answer Correct ? | 22 Yes | 8 No |
Answer / s s grewal
Before calculating the quantity of concrete required for size of pillar or size of footing at (D=0.5 m)
Formula :- L X B X d + D-d/3 x A1 + A2 + √(A1 X A2)
| Is This Answer Correct ? | 22 Yes | 9 No |
Answer / manpreet singh
suppose area at bottom A1 = (AxB) and area at top A2 (axb), where A,B,a,b are the respective lengths of footing top and bottom. further D is total depth and d is small depth of footing
formula is A1xd + (D-d)x(A1+A2 + sqroot {(A1xA2)/3}
| Is This Answer Correct ? | 18 Yes | 11 No |
Answer / r. dilli babu
Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will be
=h/3(A1+A2+Sq root of A1square+A2square)
=((.5-.15)/3)(.09+3.4+(sq root of(.09 square + 3.4 square)))
=.116(3.49+(sq root of (11.5681))
=.116(3.49+3.401)
=.116*6.891
=.799 cum
| Is This Answer Correct ? | 8 Yes | 4 No |
Answer / sagar mistry
Here you have not given the column size.
So we assume column size 300mm X 300mm.
There is an Offset after the periphery of column & it is 75mm.
Rectangular Part
=L X B X H
=2 X 1.7 X 0.15
=0.51 cum
Trapezoidal Part
=(h/3)(A1 + A2 + SQRT ( A1 X A2 )
=((0.5-0.15)/3) ((2 X 1.7) + ((0.3+0.075)+(0.3+0.075)) + SQRT ((2 X 1.7) X ((0.3+0.075)+(0.3+0.075))
=0.12 ( 3.40 + 0.75 + 0.70 )
=0.57 cum
Total Concrete
=0.51 + 0.57
=1.08 cum
| Is This Answer Correct ? | 8 Yes | 4 No |
Answer / ashish parasiya
Question is not complete because one must require top are to calculate volume for trapezoid.
| Is This Answer Correct ? | 6 Yes | 3 No |
Answer / r. ansari
Formula for trapezoidal footing quantity
Q = h/3{(a+b)+√ab}, a&b is area of bottom and top portion
=0.5/3{2x1.7+0.15x0.15+√3.4x0.0225}
=0.583 Cu.m.
| Is This Answer Correct ? | 11 Yes | 10 No |
Answer / r. suresh
Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will be
=H/3(A1+A2+sq root of A1+A2)
=((0.5-0.15)/3)(3.4+0.09+ Sq root of 3.4+0.09)
=0.621 Cum
| Is This Answer Correct ? | 4 Yes | 3 No |
what is the creep in concrete
I s code of steel
what"s the M book?
What are the uses of alloys in daily life and how are alloys made?
how to calculate the density of cement and how can we convert no. of Kgs of cement to Metric tonnes??
How much sand for a 1000 sqft residential building ?
what is lap length? why it is required?
How to design a beam without any typical(tuff) calculation. Answer Only by using site practical knowledge?
what is the significance of soundness test in Cement? and how is it done??
1 Answers Biltech Building Elements, Student,
how much time will take for G+22 building for completion? activity wise like excavation,sub structure,superstructure,finishing,handover?
What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40.
69 Answers Ashoka Distillers and Chemicals, ATS, Bajaj, Black Stone, Concor, CTM, Gaurav Constructions, HARIOM TMT, Indian Steel, IT Systems, IVRCL, L&T, MB, RCS, Sandhya Constructions, SCSVMV, Shree Cement, Shyam Group, SK, Student, Synfra, UltraTech, UPCL, URC Construction, vvip,
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
0 Answers Suraj Constructions,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)