Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.

Answers were Sorted based on User's Feedback



Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / kishore kumar

Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will
be
= 2x1.7x0.15 + (0.5-0.15)/3 x ((0.3x0.3+2.0x1.7+sqrt
((0.3x0.3)(2.0x1.7))
=0.981 m^3

Is This Answer Correct ?    98 Yes 37 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / vishal gajjar

h(=D-d)\3 * A1+A2+SqrtA1A2 = Q1
A1*A2*thickness = Q2

Q = Q1 + Q2.

Is This Answer Correct ?    40 Yes 11 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / suresh,trichirapalli

Q1=2.1*1.7*0.5
Q2=(0.5-0.15)/3*((A1+A2)+(SQRT A1*A2))
A1=Area of bottom portion
A2=Area of top portion
TOTAL QTY=Q1+Q2

Is This Answer Correct ?    22 Yes 8 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / s s grewal

Before calculating the quantity of concrete required for size of pillar or size of footing at (D=0.5 m)



Formula :- L X B X d + D-d/3 x A1 + A2 + &#8730;(A1 X A2)

Is This Answer Correct ?    22 Yes 9 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / manpreet singh

suppose area at bottom A1 = (AxB) and area at top A2 (axb), where A,B,a,b are the respective lengths of footing top and bottom. further D is total depth and d is small depth of footing

formula is A1xd + (D-d)x(A1+A2 + sqroot {(A1xA2)/3}

Is This Answer Correct ?    18 Yes 11 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / r. dilli babu

Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will be
=h/3(A1+A2+Sq root of A1square+A2square)
=((.5-.15)/3)(.09+3.4+(sq root of(.09 square + 3.4 square)))
=.116(3.49+(sq root of (11.5681))
=.116(3.49+3.401)
=.116*6.891
=.799 cum

Is This Answer Correct ?    8 Yes 4 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / sagar mistry

Here you have not given the column size.
So we assume column size 300mm X 300mm.
There is an Offset after the periphery of column & it is 75mm.
Rectangular Part
=L X B X H
=2 X 1.7 X 0.15
=0.51 cum
Trapezoidal Part
=(h/3)(A1 + A2 + SQRT ( A1 X A2 )
=((0.5-0.15)/3) ((2 X 1.7) + ((0.3+0.075)+(0.3+0.075)) + SQRT ((2 X 1.7) X ((0.3+0.075)+(0.3+0.075))
=0.12 ( 3.40 + 0.75 + 0.70 )
=0.57 cum
Total Concrete
=0.51 + 0.57
=1.08 cum

Is This Answer Correct ?    8 Yes 4 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / ashish parasiya

Question is not complete because one must require top are to calculate volume for trapezoid.

Is This Answer Correct ?    6 Yes 3 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / r. ansari

Formula for trapezoidal footing quantity
Q = h/3{(a+b)+&#8730;ab}, a&b is area of bottom and top portion
=0.5/3{2x1.7+0.15x0.15+&#8730;3.4x0.0225}
=0.583 Cu.m.

Is This Answer Correct ?    11 Yes 10 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / r. suresh

Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will be
=H/3(A1+A2+sq root of A1+A2)
=((0.5-0.15)/3)(3.4+0.09+ Sq root of 3.4+0.09)
=0.621 Cum

Is This Answer Correct ?    4 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

pls can some one tell me details of coloumn shuttering like at what distance the supports should be palace and no. of supports

1 Answers  


what are the values of compressieve strenght?

0 Answers  


how to calculate the required qantities of cement, Sand and aggrigate to prepare 1 Cum of concrete mix 1:2:4

5 Answers  


different types of footing. and difference between footing and foundation

1 Answers  


What are causes of cracks in outside plaster of a building and how we prevent it during constructions?

6 Answers  


what grades of reinforcement steel are available in market

4 Answers  


whate the size of bricks are avalable at site

5 Answers  


what is the 0 value in quantity surveying

0 Answers   Jindal,


what is the grade of 1:2:1 concrete mix

1 Answers  


How much qty. of cement used for laying 1 Sq.Meter of tiles(600mmx600mm)

1 Answers  


The point of contraflexure occurs in

10 Answers  


What is meant by Friction Pile?

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)