Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.

Answer Posted / kishore kumar

Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will
be
= 2x1.7x0.15 + (0.5-0.15)/3 x ((0.3x0.3+2.0x1.7+sqrt
((0.3x0.3)(2.0x1.7))
=0.981 m^3

Is This Answer Correct ?    98 Yes 37 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define different types of roof systems?

735


In cement concrete how to check a quality of material also proportion of material at site ?

1436


please briefly explain calculating or estimating steel quantity for a RCC column?

1446


natucher of concrete &type of concrete?

1902


cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?

1893






Which purpose we use deck anchor in bridges?

644


Define What is a kip?

730


The mixture of different ingredients of cement is burnt at?

1107


As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.

1434


Cement consumption of one cubic meter of aerocon blocks masonry?

3677


I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?

1676


For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?

1782


residential projects,structural.

2415


what are RIB slabs explain about it

2189


What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

1749