Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / kishore kumar
Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will
be
= 2x1.7x0.15 + (0.5-0.15)/3 x ((0.3x0.3+2.0x1.7+sqrt
((0.3x0.3)(2.0x1.7))
=0.981 m^3
Is This Answer Correct ? | 98 Yes | 37 No |
Post New Answer View All Answers
Define different types of roof systems?
In cement concrete how to check a quality of material also proportion of material at site ?
please briefly explain calculating or estimating steel quantity for a RCC column?
natucher of concrete &type of concrete?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
Which purpose we use deck anchor in bridges?
Define What is a kip?
The mixture of different ingredients of cement is burnt at?
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
Cement consumption of one cubic meter of aerocon blocks masonry?
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
residential projects,structural.
what are RIB slabs explain about it
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m