Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / manpreet singh
suppose area at bottom A1 = (AxB) and area at top A2 (axb), where A,B,a,b are the respective lengths of footing top and bottom. further D is total depth and d is small depth of footing
formula is A1xd + (D-d)x(A1+A2 + sqroot {(A1xA2)/3}
Is This Answer Correct ? | 18 Yes | 11 No |
Post New Answer View All Answers
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
What is the meaning of a blue land surveyors flag?
what are the types of design? which type of method is used at what type of design & why?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
why demand factor less then 1 ?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
Doul Bar reinforcement and details of drawing.
What is zoning permit?
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
how many litres of enamel paint required for 5000 sft of site??
What is the difference between 53 grade and 43 grade cement
What is portland cement
Specific gravity of cement?
List out some of the common problems that architect have to tackle it?
Why does the pressure increase under soil?