Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


1 building project (work in progress) and following are sum
detail about his project
1) Using local rebar grade 415
2) Total built up area- 60000 sq.ft
3) Floors to be constructed – 21 storey
4) Estimated requirement of Steel per sq. foot –
7KG/sq.ft
5) Concrete grade – M35
6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm
for stirrups)

Wanted to ask u if this person uses 500D…what are the
benefits he will be getting? Whether his per Sq. foot
consumption can b reduce? If yes den around how much?



1 building project (work in progress) and following are sum detail about his project 1) Using loc..

Answer / wicked_dipen

plz ny1 help me in finding this answer

Is This Answer Correct ?    3 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

How can you achieve soil enforcement?

0 Answers  


What is bending movement formula define

1 Answers   L&T,


strength vs shape factor

0 Answers  


HOW to calculate Rate analysis of M15 GRADE DESIGN MIX RATIO 1:2.5:5 WITH 40MM Size aggregates for 1 cumtr.

2 Answers   Adani,


what is meant by Stagging?

3 Answers   Alembic, Shirke,


what is a exact size of a cube?

7 Answers   Green Concretex,


flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force

0 Answers  


M30 me kitan pani lagat hai

0 Answers  


how many materirials in 1 m3 concrete

5 Answers  


1:6 brick masonry cement and sand calculations

2 Answers   NCC,


how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?

0 Answers  


How we calculate the service time of buildings

0 Answers   SPML,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)