1 building project (work in progress) and following are sum
detail about his project
1) Using local rebar grade 415
2) Total built up area- 60000 sq.ft
3) Floors to be constructed – 21 storey
4) Estimated requirement of Steel per sq. foot –
7KG/sq.ft
5) Concrete grade – M35
6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm
for stirrups)
Wanted to ask u if this person uses 500D…what are the
benefits he will be getting? Whether his per Sq. foot
consumption can b reduce? If yes den around how much?
How can you achieve soil enforcement?
What is bending movement formula define
strength vs shape factor
HOW to calculate Rate analysis of M15 GRADE DESIGN MIX RATIO 1:2.5:5 WITH 40MM Size aggregates for 1 cumtr.
what is meant by Stagging?
what is a exact size of a cube?
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
M30 me kitan pani lagat hai
how many materirials in 1 m3 concrete
1:6 brick masonry cement and sand calculations
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
How we calculate the service time of buildings
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)