Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.

Answers were Sorted based on User's Feedback



Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / ashok kumar chaudhary

Dear Sir,

SOLUTION :-

=((LxBxd)+(LxBxD/2))M3
Here L=2.0M
B=1.7M
d=0.15M
D=0.50M
((2.0x1.7x0.15)+(2.0x1.7x(0.50-0.15)/2))
=((0.51)+(3.4x(0.35/2))
=((0.51)+(0.595))
=1.105 M3 Ans.

Is This Answer Correct ?    0 Yes 0 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / anand shinde

h=(D-d)

(D-d)/3x(a1+a2x(under root a1xa2)

Is This Answer Correct ?    0 Yes 1 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / banambar pradhan

Dear all,

DURING THE PERIOD OF CONSTRUCTION TRAPIZODIAL COMES OVER THE
RECTANGULAR.
FORMULA IS-SQUARE+TRAPEZOIDAL

SQUARE =2X1.7=3.4XDEPTH 0.15=0.51 M3

TRAPEZOIDAL=H/6(A1+A2+4((A1+A2/2)^2))

SO=0.5/6(2^2+A2VALUE NOT GIVEN IN THIS QUESTION+4(2^2+A2
VALUE NOT GIVEN/2)^2))
IF A2 VALUE COULD HAVE GIVEN THEN WE CAN GET THE ANSWER EASILY

Is This Answer Correct ?    0 Yes 1 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / naresh

u can calculate easily
suppose in trapezoidal footing we always find d &D
D - l * b * h
d- bottom l & b
top l& b after than calculate center of top & bottom
lets define l = 2m b =2m bottom
l = 1m b = 1m top then centre of both 1.5 × 1.5 multiply by half d .

Is This Answer Correct ?    0 Yes 1 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / karthikeyan

Volume = ((D+d)/2)*B*L
= ((0.5+0.15)/2)*1.7*2
= 0.325*1.7*2
= 1.105 cubic meter

Is This Answer Correct ?    45 Yes 68 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / mohd.younus ali , je (pr )

Top Length = L1
Bottom Length = L2
Top Breadth = B1
Bottom Breadth = B2
Depth = D

Then simple formula is
(L1+L2)/2=L
(B1+B2)/2=B
The Quantity of Concrete is = L * B * D

Is This Answer Correct ?    16 Yes 51 No

Post New Answer

More Civil Engineering Interview Questions

in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

0 Answers  


HOW WE CALCULATE OR FIND OUT THE DEGREE OF FREEDOM IN A SIMLY SUPPORTED BEAM? IF THERE IS HINGE THEN HOW? & ALSO IN A PORTAL FRAME? PLEASE GIVE A EXAMPLE FOR EACH QUESTION.

1 Answers   CCCL, PSCI,


How to convert 0.44 N/MM2 in to Kgf/cm2

2 Answers   Ukay Metal Industries,


we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants

0 Answers  


how to convert udl into point load??

1 Answers  


what is the meaning fe in steel?

1 Answers   Manjeera, Oceanus, PAN, URC Construction,


Stander Size of Brick

11 Answers   Unitech,


what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????

0 Answers  


In barbending schedule why is o.42*D is taken. Means why o.42 only???

1 Answers  


I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??

0 Answers  


how can we design dia of rainwater pipes ? plez explain by using formula ?

1 Answers  


How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)