Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answers were Sorted based on User's Feedback
Answer / ashok kumar chaudhary
Dear Sir,
SOLUTION :-
=((LxBxd)+(LxBxD/2))M3
Here L=2.0M
B=1.7M
d=0.15M
D=0.50M
((2.0x1.7x0.15)+(2.0x1.7x(0.50-0.15)/2))
=((0.51)+(3.4x(0.35/2))
=((0.51)+(0.595))
=1.105 M3 Ans.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / banambar pradhan
Dear all,
DURING THE PERIOD OF CONSTRUCTION TRAPIZODIAL COMES OVER THE
RECTANGULAR.
FORMULA IS-SQUARE+TRAPEZOIDAL
SQUARE =2X1.7=3.4XDEPTH 0.15=0.51 M3
TRAPEZOIDAL=H/6(A1+A2+4((A1+A2/2)^2))
SO=0.5/6(2^2+A2VALUE NOT GIVEN IN THIS QUESTION+4(2^2+A2
VALUE NOT GIVEN/2)^2))
IF A2 VALUE COULD HAVE GIVEN THEN WE CAN GET THE ANSWER EASILY
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / naresh
u can calculate easily
suppose in trapezoidal footing we always find d &D
D - l * b * h
d- bottom l & b
top l& b after than calculate center of top & bottom
lets define l = 2m b =2m bottom
l = 1m b = 1m top then centre of both 1.5 × 1.5 multiply by half d .
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / karthikeyan
Volume = ((D+d)/2)*B*L
= ((0.5+0.15)/2)*1.7*2
= 0.325*1.7*2
= 1.105 cubic meter
| Is This Answer Correct ? | 45 Yes | 68 No |
Answer / mohd.younus ali , je (pr )
Top Length = L1
Bottom Length = L2
Top Breadth = B1
Bottom Breadth = B2
Depth = D
Then simple formula is
(L1+L2)/2=L
(B1+B2)/2=B
The Quantity of Concrete is = L * B * D
| Is This Answer Correct ? | 16 Yes | 51 No |
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
HOW WE CALCULATE OR FIND OUT THE DEGREE OF FREEDOM IN A SIMLY SUPPORTED BEAM? IF THERE IS HINGE THEN HOW? & ALSO IN A PORTAL FRAME? PLEASE GIVE A EXAMPLE FOR EACH QUESTION.
How to convert 0.44 N/MM2 in to Kgf/cm2
2 Answers Ukay Metal Industries,
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
how to convert udl into point load??
what is the meaning fe in steel?
1 Answers Manjeera, Oceanus, PAN, URC Construction,
Stander Size of Brick
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
In barbending schedule why is o.42*D is taken. Means why o.42 only???
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
how can we design dia of rainwater pipes ? plez explain by using formula ?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)