Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

We get an error message "Control parameters for scheduling
not defined" while creating test production Orders. Why?

Answer Posted / guest

Before you attempt creating Production orders, configure your
Order types- Transaction Code OPHJ
Order type Dependent parameters - Transaction Code OPL8
Backorder Scheduling - Transaction Code OMIH
Scheduling Levels - Transaction Code OMIF

Is This Answer Correct ?    3 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How requirements( pir, sales order, customer requirement) are reduced after they are produced?

1222


Checkdigit example

2277


We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?

986


What is Phantom Assembly?

1509


How to move to the realization phase?

1228


What is Schedule Margin key. How floats works in scheduling?

3110


What is Material status and which view of the material master it is available?

1433


In the monthly lot size proc, how to generate lot at the end of Period?

4407


Difference between PP and PI.

2158


Mention what are the keyfields found in mrp view 1?

1056


What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?

1188


• How are basic order dates determined?

2187


What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?

2119


What is golive actually? What is the role of a functional consultant in golive actually?

998


How to create prt master records?

1008