Explain the uses of the simple maintenance interface?
No Answer is Posted For this Question
Be the First to Post Answer
I want to make a career in SAP-PP/QM from the existing manufacturing experence.
Explain DMR.
What is 'capacity planning'?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
How do you integrate HR (employee) with PP?
what is group bom? Is it possible to attach the drawing for a material to bom? How?
Checkdigit example
One work center can assign 2 cost center and one cost can assign to different work center.
Describe control key utility & also standard key ? how many fields can be configured for standard value key?
what are the settings needed for variant configuration?
what is the need of pp in sap, what is the flow diagram of sap pp.
Scheduling times can be defined in the material master record by?