What is the significance of order types in PP?
Answers were Sorted based on User's Feedback
Answer / sachin mahendrakar
The significance of order types is as follows:-
Decides how production versions are selected either
manually or automatically
Decides how routings are selected.
Decides how status changes happen in order header,
operation, materials and for PRT.
Decides how documentation of GR and GI happens for an order.
Decides when the costs should be calculated i.e whether
while release or saving.
Is This Answer Correct ? | 22 Yes | 2 No |
Answer / devendra
It means parameter requires for the order creation.it is
necessary in order creation.
the stepwise customization for the order as follwing
1) create order type i.e. pp01
it is require,what type of master data to be picked up
during the order creation i.e.number range & controlling
parameter
2)assign the number range to the order type created.
it is mandatory entry, otherwise system displays error
3)create the parameter for schedulling margin key.it
requires how to schedule the prodyuction order.
4)confirmation parameter requires to complete the
production.
5)default values requires to define operation in production
order creation.
All such settings are performed in shop floor control
Is This Answer Correct ? | 12 Yes | 2 No |
Answer / rama
order types are divided into subcategories like production
order (normal), process order (for process industries
food ,chemicals), network orders (in ps systems),rework
order etc.
we can collect the costing information for these sub
categories.
Is This Answer Correct ? | 6 Yes | 3 No |
Answer / nanduri k. prasad
Though the above answers are correct, the following order
type are used.
PP01 - normal order ---- as explained above.
PP02 - Rework order ---- Here we have to decide only rework
to be done or it requires some extra materials also.
Like wise the other order types has different significances.
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / prabhu
Tool that categorizes orders based on the purpose/needs.
Eg:
Production Orders
Maintenance Orders
Spares Orders
Marketing Orders
Development Orders
Is This Answer Correct ? | 1 Yes | 1 No |
What is planned consumption and unplanned consumption?
How you can implement new production order type?
What is it 41 used for?
What is alternative BOM, or diff between BOM group and Group BOM?
Do you use group BOMs for engineering/design and copy or assign them to plants at implementation?
What is Variant configuration?
One component 2 times assign to bom
What is costing? How it is affected the pp?
Difference between byproduct and co-product.
What is meant by payscale structure?
In lsmw which is most important step?
What is sap pp?