Answer Posted / devendra
It means parameter requires for the order creation.it is
necessary in order creation.
the stepwise customization for the order as follwing
1) create order type i.e. pp01
it is require,what type of master data to be picked up
during the order creation i.e.number range & controlling
parameter
2)assign the number range to the order type created.
it is mandatory entry, otherwise system displays error
3)create the parameter for schedulling margin key.it
requires how to schedule the prodyuction order.
4)confirmation parameter requires to complete the
production.
5)default values requires to define operation in production
order creation.
All such settings are performed in shop floor control
| Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
What are basic dates?
Define standard cost
What is MRO area & MRP group & some difference
Mention what is the purpose of using capacity planning?
What are the keyfields found in mrp view 1?
What are the basic dates?
Checkdigit example
You want to insert an inspection check point at the end of an operation. How would you do that?
Explain how to create prt master records?
What is SOP and types of SOP?
What is scheduling
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
What is meaning of customized reports?
How is time management and payroll is integrated?