Answer Posted / sachin mahendrakar
The significance of order types is as follows:-
Decides how production versions are selected either
manually or automatically
Decides how routings are selected.
Decides how status changes happen in order header,
operation, materials and for PRT.
Decides how documentation of GR and GI happens for an order.
Decides when the costs should be calculated i.e whether
while release or saving.
| Is This Answer Correct ? | 22 Yes | 2 No |
Post New Answer View All Answers
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
Explain how to create prt master records?
Explain Planning file entry.
What is it 41 used for?
Mention how mrp (material requirement planning) types are classified?
What is the output of mps run ?
Define standard cost
How to insert an inspection checkpoint at the end of an operation?
How do you integrate HR (employee) with PP?
Explain why there is need of production version?
What does a PP Consultant do in his/her real time?
Difference between plan cost, Actual cost and target cost.
Explain Flexible Planning procedure or How many levels of Flexible planning.
Can’t one material be assigned to more than one operation in a routine?
If u maintain sub-contacting where and how will be reflect