What do we do in the realization phase?
No Answer is Posted For this Question
Be the First to Post Answer
Explain Planning file entry.
If u maintain sub-contacting where and how will be reflect
Do your single-level BOMs represent production levels and do you keep your BOM header materials in stock? If not, do you produce non-stock items, or are some assemblies just used as structural elements in a BOM?
What is mrp procedure
If there are some errors in goods movements, and less stock of material consumed, how can i solve that problem in SAP.
What are sequence, parallel, overlapping, splitting and where can we assign these
What is number range and where will be configure
Explain what is PRT – how many types of PRT is used?
what is the difference between backward scheduling and forward scheduling ?
Can we have more than 6 standard values in standard value key?
Tell some standard order types and what configure done for current project
what do you mean by planning time horizon