What r different reduction startergies in SAP PP?
Answers were Sorted based on User's Feedback
Answer / sandeep
Different reduction strategies are. Reduction of
floats,Overlapping,Splitting,Reduction of move time.
Is This Answer Correct ? | 14 Yes | 2 No |
Answer / animesh kumar
please narrate whether you are taking about redction
strategies of LEad time in scheduling or redction on PIR
Is This Answer Correct ? | 7 Yes | 0 No |
Answer / girish
There is Confusion in word Reduction ,2 answers
1)Reduction of Planned independent requirement with each planning strategy,
For this Mr.Anand has given the answer.
2)Reduction of the Time, in Lead time scheduling ,if the Lead time scheduling dates are going out of the Basic dates .
For operation time reduction there are maximum six reduction levels can be applied.
the order is rescheduled after each reduction level.
The Reduction measures are :
A)maintain as less Queue Time as possible.
B)reduction in processing time by order splitting ,overlap
C)AS less as move time
d) adjust the 'After and Before Floats'.
Is This Answer Correct ? | 5 Yes | 2 No |
Answer / prabhu
Reduction Strategy:To reduce the lead time for scheduling
by Reducing the Que time,Reducing the Transport time,By
overlapping and introducing the Number of splits.
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / harihara
Can you please explane the above said strategies?
Is This Answer Correct ? | 4 Yes | 2 No |
Answer / srinu
Reduction strategy means reduce the time intervels in the
Production.for example, overlapping and skipping.
Is This Answer Correct ? | 9 Yes | 8 No |
Answer / anand patil
PIR Reduction for different Planning strategies are as
below:-
Strategy
Strategy 10 Goods issue (sales order; "anonymous")
*(make to stock:- net requirement planning PIR )
Strategy 11 Goods receipt
* (MTS gross requirement planning-PIR)
20 Goods issue to sales order
*(make to Order:- Purely Against sales order requirement
planning, PIR against sales order )
30 Goods issue (sales order; "anonymous")
* ( MTS lot size )
40 Goods issue (sales order)
* ( MTS with final assy )
50 Goods issue (sales order)
* ( MTO without final assy )
59 Goods issue (backflushing)
70 Goods issue (production order)
* (MTS at aasy level )
74 Goods issue (production order)
82 Goods issue (sales order)
Is This Answer Correct ? | 6 Yes | 7 No |
Answer / sambit
PIR Reduction for different Planning strategies are as
below:-
Strategy
Strategy 10 Goods issue (sales order; "anonymous")
Strategy 11 Goods receipt
20 Goods issue to sales order
30 Goods issue (sales order; "anonymous")
40 Goods issue (sales order)
50 Goods issue (sales order)
59 Goods issue (backflushing)
70 Goods issue (production order)
74 Goods issue (production order)
82 Goods issue (sales order)
Is This Answer Correct ? | 8 Yes | 11 No |
What are the reports generated in product cost controlling information system?
What are mandatory fields for PP configuration
What is routing in sap pp?
How do I default it 41?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
What do you mean by Production Support,with some examples?
Mention how mrp (material requirement planning) types are classified?
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
Difference between plan cost, Actual cost and target cost.
Explain what is sap pp?
What is detail scheduling
how to know a component create date after WO released