What r different reduction startergies in SAP PP?
Answer Posted / sandeep
Different reduction strategies are. Reduction of
floats,Overlapping,Splitting,Reduction of move time.
| Is This Answer Correct ? | 14 Yes | 2 No |
Post New Answer View All Answers
After doing realization how we will check whether it is working or not?
What is the use of mrp group?
Mention what is the purpose of using capacity planning?
Why the work scheduling view is required for semi-finished and finished products?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
What parameters you maintain in “plant parameters” in configuration?
Mention how mrp (material requirement planning) types are classified?
What is costing? How it is affected the pp?
Are there any reports in sap to list of material requirement from ltp ?
What are the steps of production execution process?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
What are dynamic actions? Give a few examples. What are it’s you used in them?
Define standard cost
List out the activities carried out in production planning?
How do you restrict the data to be entered in the payroll area?