One component 2 times assign to bom
Answer / mohit chhillar
1. yes we can assign one component 2 times by recursiev
bom.
3. assign the store location x in bom.
4. yes we can do it by change in parameter make routing
optional add crate production order in work shop floor. its
t- code is co01.
5. question is rough.
6. work center is a placed where all production activity are
carried out.
9. n times. but we assign one key at a time.
11. MTO make to order, MTS make to stock.
12. by release the production order partial.
13. Gap analysis means to identify the gaps between how the
business operates ad its needs against what the package can
& can't do.
15. alternative bom may be defined as the one bom is
corresponding to another bom.
Is This Answer Correct ? | 1 Yes | 0 No |
How requirements( pir, sales order, customer requirement) are reduced after they are produced?
How the process time is calculated in a wc when both labour, machine categories exist?
Define mrp controller
Have you used Pull list or back flushing in REM?
can any one tell me what is the difference between MRP and MPS?
what is recurssive BOM ?
List out the basic procedure for dispatching operations in capacity leveling?
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
Hi Sir, Please guide me i am an BSc computer science graduate with MBA in Agri business having 3 years of exp in Food Processing Industry in Production please advice shall i persue with SAP PP? Many thanks
Where have we to specify the teardown time in one operation?
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
What do we do in the realization phase?