Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What are the phases inspections are done by local authority while construction?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

how can we determine the quantity of steel bars in a structure? is there any formula for determing the number of bars required ?

3 Answers   Nespak,


how much solid block in 1m3

8 Answers  


explain five benefits of using standard terminology in the measurement process?

0 Answers  


What are the joints wants to made in masonry where door opening, arches like etc..

0 Answers  


how statics is different from dynamics

0 Answers  


Whether dry volume or wet volume of concrete more but why?

1 Answers   Hiranandani,


What is vertical dpc and where it is construct?

1 Answers   Kanwarji Construction,


what radial pressure, the NP2 class rcc pipe can sustain?

0 Answers   DVC,


Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??

0 Answers   NCC,


Calculate no of brick req 230cmx115cmx100cm

4 Answers   TFC,


what is the weight of 8mm dia steel with 1 meter length. Is there any formula to calculate the weight for any given diameter

48 Answers   Benny Industries, D M Systems, L&T, MYC Infra, OL, PWD, Shell, SMB, SODI, Spyro Engineers, TNS, Welspun,


A floor has to be removed partially with block work tying floors together, can block work continue on floor that has to removed excluding demolishing works tying floor from underside of slab and top of slab demolishing floor upon completion?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)