What are the phases inspections are done by local authority while construction?
No Answer is Posted For this Question
Be the First to Post Answer
why the horizontal crack occoured in the joint between brick work and lintel?pls. give clarification???
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
How much is the curing time period?
what is chicken mesh?explain its use
What is the Allowable silt content of sand for construction purposes?
Explain why concrete barriers have curved surface profiles?
What is the general specifications of a bituminous pavement road?
What isthe formula for square
1 Answers Panchayati Raj Department,
What are the effects of water on shear strength and foundations?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how to caluclate sienerge qty in construction in ap
0 Answers Rites, VR Residency,
you are a civil engineering student so what you have done to improve your knowdge
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)