what are the Cement Coefficient for Block Work & plastering
Work?
Answer / ballal
Siporex Block Work has 0.18/sqm of cement consumption whereas
Plastering Work
a)External Plaster 1st coat 0.13/sqm
b)2nd coat comprising of 0.08/sqm,
c)Internal Plaster has 0.13/sqm.
Is This Answer Correct ? | 4 Yes | 0 No |
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
what is the diffrence between Specific gravity & Density??
Please tell me the difference between nominal and clear cover. Thanks.
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
What are the Types of foundation?
polavaram project is situated inwhich place?
How do we calculate the weight of aggregates, sand and cement M 25 design mixfor 1 cum
how much kgs should Cement,sand & aggregate to be added for 1cumt,mix is M15,M20,M25,M30
How to distinguish that the soil is clay, silt, sand & murrum at site. (just by looking at it with out doing the sieve analysis test??
beam is fixed at both end which is 8 m span carry udl of 10 kn/m at left half span.there is internal hinge at center.what is reaction at center
Quick setting cement's setting time?
7 Answers TNPSC Tamil Nadu Public Service Commission, UPPSC Uttar Pradesh Public Service Commission,
What is the percentage of steel in 1cu.m. RCC?