Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


we have a texmo make submersible water pump 5hp 10 stage
what will be the total head & is it any thumb rule for
calculating the head please reply urgently

Answers were Sorted based on User's Feedback



we have a texmo make submersible water pump 5hp 10 stage what will be the total head & is it ..

Answer / mohan rao

per stage it will be around 28 ft if it is radial flow

Is This Answer Correct ?    7 Yes 4 No

we have a texmo make submersible water pump 5hp 10 stage what will be the total head & is it ..

Answer / kumar

head vary as per overall diameter ,no of leaf

Is This Answer Correct ?    3 Yes 0 No

we have a texmo make submersible water pump 5hp 10 stage what will be the total head & is it ..

Answer / kanijohn

Q*H/75= 5

so Q*H= 375

H = 375/Q

Q = Flow in Liters/mins

H = Height (Total Height Suction + Delivery )

This is general Formula for Pump
If the Pump is Stage check with Manufactors Catlock.

Is This Answer Correct ?    4 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

1)pile is of 200mm dia.-- a)tell the cutting length of ring considering 2cm cover b) tell the quantity of concrete considering pile length as 3m c) tell concrete quantity in bulb

3 Answers  


what is mean by bulking of sand?

1 Answers   CCCL, Mytas,


how much thickness of roof truss?

1 Answers  


How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel

0 Answers   Wonderla Holidays,


How do we say The LAP LENGHT is 50D to 60D ?????

3 Answers  


bar bending schedule?

3 Answers  


how to creat mix m-20? and how to check shuttering & how is mark layout at open ground

1 Answers  


why we need pcc?

2 Answers  


In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?

0 Answers  


How many binding wire is use in arrangement of 25mt steel

2 Answers  


What is green building?

13 Answers  


Rate of plasting per sq.ft...?

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)