why are you joining in this
(applied post) job and your
aim for this job
No Answer is Posted For this Question
Be the First to Post Answer
I have used the proportion of cement:sand:gravel, is 1:2:4. cement and the sand was provided by the company but i provided the gravel. this combination was used to fill 500 cubic ft of wall. now i want to know how much gravel was used in making the wall. can you guys please help me?
what is the actual productivity of carpentor,fitter,masson for brickwork and masson for plaster etc
Soil bearing capacity formula
17. What is the thing that can disappoint you while working for a certain employer?
what is the specification for silt content in sand
how gradation of aggregates effect on slump of fresh concrete?
A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?
how many m3, mason should done per day if he going to build 4.5 inch brick work(partition wall)?
What is the release of lien?
Can we weld hot rolled steel ASTM A615 ?
how much weight of 20 mm aggregate in bras?
What is full form of r.c.c?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)