Answer / tatyasaheb gaikwad
Bending moment towards one and two direction its share
loads.this proses one way slab and two way slabs method.this
bent up length l/7.
| Is This Answer Correct ? | 8 Yes | 3 No |
give me the mix proportion for design mix concrete M10 grade 1:4:8
13 Answers Gammon, IOCL, PSL, SDG, Simplee, STUP Consultants Pvt Ltd,
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
0 Answers Quaid-e-Azam International Hospital,
1:4:8 pcc calculation 591 cu.ft
What is vertical dpc and where it is construct?
1 Answers Kanwarji Construction,
How to distinguish that the soil is clay, silt, sand & murrum at site. (just by looking at it with out doing the sieve analysis test??
indian standard split spoon sampler
For M30 grade how much cement bags will need for one cubic meter qty
How to correct a column which don't have sufficient cover?
Plan and schedule for 14 towers of 6 floors each with 6 flats on each floor?
how much quantity of sand,cement,reqired for 100sqft of wall construction. And how much quantity required for plastring
1 Answers Jade Software, NSP, TCS,
What is bending moment?
Explain the various stages of the project planning process in construction?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)