What is the result of cube in 7 days test ?
Answers were Sorted based on User's Feedback
Answer / prasad sathe
It must achieve 67% in 7 days test of crushing.
Is This Answer Correct ? | 14 Yes | 2 No |
in 7 days 65% of the characteristics compressive strength will be achieved. the test will be important because, as per standards the form work will be removed after 7 days of curing.
Is This Answer Correct ? | 0 Yes | 0 No |
what is the use of bottom reinforcement in Cantilever Beam?
What are the different methods for drawing an arc?
how much steel provide in 1m cube r.c.c
Brick work how many days curing and at any concreting pl
what is the minium content of cementous material per cu meter
What"s the brick size we use in construction?1.190x90x90 2.230x100x75 Which one "s correct?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
how can calculate cutting length of diamond ring
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
how we calculate the vol.of wet concrete..?
In earth work 1300 cum soil how to calculate how many liters require in water
what is the difference between lap length & development length of reinforcement steel bars
1 Answers APGenco, Consolidated Construction Consortium Limited,