The gap found between the “as is study” and the “to be study” is called as gap analyses, or the requirement of the client which is not possible in the standard sap is called as gap analysis…
EX-1: EXAMPLE -The client requirement is 3 new incoterms required to calculate freight charges to customers.
Incoterms need to be maintain in customer master data
correctly.
Solution option 1-(high level description)--
suggest to create 3 new incoterms like-
1. ZFC -Freight country india
2. ZFM -Freight metropolitan
3. ZFR -Freight rush order
Then assign these 3 new incoterms to the customer master
record,using the existing key combination sales
org/DC/Incoterms,use the existing access seqence and create new condition record for the freight condition.
AS a result Incoterm is autometically populated in the order entry screen which avoids the manual workby order
management,thus increase order processing efficiency &
minimum errors .
Solution option 2-
Manual entry of the incoterms at the time of the creation of sales order .
Therefore ,with the above analysis we do not recommend using the manual method ,So solution option 1 has used for this gap.
EX-2: Before implemeting the sap legacy model you might have a number of sales order in place created through sales forec.com and it might be a trobule some in creating the revenue account WHICH WAS Identifed and with the help of sap legacy model we created couppled all te sales order in a single doc and thus it was must convient in posting the sales doc billoing valeues in prepation of credit or debit invoice
EX-3:
In the delivery model once the delivery was done we used to immeditely go in for PGI and had to be mainted each
individualy Once sap module was put into pratice we created the dleivery schdule byt adding the coumns for routing and transprt thus the whoe porcess was found to be more systematic and frinendly.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / laxman
I have come acrossed this below GAP Analysis in my
experience
At the time of AS - IS prepared; Client requirement is
" All the correction done by end user from the default
values of the critical fields at the time of order creation
(before saving)need to be get in report form."
It was agreed with the assumptions that, it will be
possible at STD SAP.
Since Standard SAP does not capturing the critical field
changes before saving the sales order, we could not able to
use the standard SAP report.
This is called GAP analysis. Simple meaning is " the
differents between agreed work and completed work".
Is This Answer Correct ? | 1 Yes | 3 No |
What is the client-specific data?
hi, i have one problem wen i'm practising...we were creating sales order in std doc type OR. the material has mrp type std ND(noMRP) and item category TAN which was assigned to scheduleline category CN (NO CHECK). wat happened is the system automatically propse the material availability date as 31.12.2008, eventhough i havent configured availability check. so tht i cant make delivery for this order.... i ve tried many time with diff customer...but the same error was happened....can u pls tell me y it is happened?
In sales order how system does picks up plant?
if we maintain shipping condition 01 in customer master data(xd01) and shipping condition 02 in document type OR what wil hapen when wil raise sales order?
what are the techniques available in delivery scheduling?
Where do we can find pricing procedure indicator in sd ?
Hi, My requirement is when we create an order with reference to quotation or contract (mainly) the quantity should not be changed in sales order.So i would like to know how to do these settings if i want to control these??? Its very urgent for me. Thanks in advance.
in third party sales, i don't want to create the customer invoice,unless vendor invoice is posted.how do we control it?
can we assign shipping point to the sales organization ? in sap r/3 ? if yes how ?
1. what is functional spec and how it should be in ur project? 2 wt is the gaps (gap analysis) in ur projectat realization stsge? 3 wt r the different pricing procedures in ur projct ? 4 wt r the routines u create at ur project?
How is credit control determined in sap?
How to configure that an all India basis company wants to give free gift on every purchase to the customers of Kolkata only on the occasion of Durga Puja only for 7 days (customers of rest of India will not receive that discount)?