1000 pieces you run mrp on that time use md02 or md01
Answers were Sorted based on User's Feedback
Answer / venkat
1000 pieces means I should use MD01, As MD02 is single item and multi-level planning.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / arun k
1000 pieces means, we need to use the md01 - total planning at plant level
Is This Answer Correct ? | 0 Yes | 0 No |
How do you integrate HR (employee) with PP?
What is Routing & rerouting
Explain the mrp list and their uses.
What is planning file entry
Tell me different mrp types
while extending the material master view after saving error is coming that the field material number is defined as a required field,it doesnt contain an entry. After selecting that it is showing the particular material may be locked. Pls do the needful.
How many types of SOPs are there?
What happens to plan after it has been converted into production order?
What are the different type of BOM usage?
Which BOM item category you have used?
Tell some sop
can any one tell me what is the difference between MRP and MPS?