1000 pieces you run mrp on that time use md02 or md01
Answers were Sorted based on User's Feedback
Answer / venkat
1000 pieces means I should use MD01, As MD02 is single item and multi-level planning.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / arun k
1000 pieces means, we need to use the md01 - total planning at plant level
Is This Answer Correct ? | 0 Yes | 0 No |
What are the tools used in SAP PP support project?
Can’t one material be assigned to more than one operation in a routine?
when we need to close the production order, before the manufacturing or after the manufacturing
Integration between PP and QM Module.
How can you create production order without routing and BoM?
what is the major ticket in your experience
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
What is the significance of order types in PP?
what is the need of pp in sap, what is the flow diagram of sap pp.
How do you get the system to update this value from the routing?
Are there any reports in sap to list of material requirement from ltp ?
what is the meaning of explodinG a BOM