12 mm dia not available at site for raft, 10 mm are available at site how to calculate?
Answers were Sorted based on User's Feedback
Answer / mohd rashid
Calculate the x sectional area of the 12mm dia bars
Then calculate the no of 10 mm dia bar keeping the x sectional area same as of 12mmdia bar..place increased no of 10 mm dia bar in the given lenghtn breadth with new spacing.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / paras bhanushali
calculate the 12mm dia bars total weight with spacing .
according to 10mm dia bars weight describe .
and spacing done
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / mohammed imtiaz
Required Ast/ Cs of area of bar to be provided(10mm).
for ex: no.of bars for T12 = 20nos (Req ast=2261.94sqmm)
No.of bars for T10= 2261.94/78.53
= 29
Hence we can provide 29 nos of T10 instead of 20T12.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / vaideeswaran
T12 = 140 c/c, ( As per Dwg)
T10(site availability) = (Spacing ?)
Unit Weight of T12 = 0.888 , T10 = 0.616.
0.616/0.888 = 0.693% times lower than T12 ,
0.693 x 140 mm = 97.117 , Say = 97 mm c/c.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / stejith
dimension of the area not mentioned. or if the weight of 12mm bars are known we can calculate the total 12mm full rod bars needed.
| Is This Answer Correct ? | 3 Yes | 4 No |
Answer / ameen salim
Measurements of slab and spacing of 12mm steel is not Mentioned in your question,
At first you have to calculate area of steel (Ast) designed by the structural engineer for that particular area (from structural drawing you can calculate). Then placed the 10 mm steel instead of 12 mm steel as per Ast you got.
Note:
Adjust the spacing as per Number of steel (10 mm) you have to placed as per calculation.
| Is This Answer Correct ? | 3 Yes | 4 No |
Answer / sitaram sharma
Calculate as per following formula.
ND1=ND2
Where N1 is the Number of D1 ( Dai) Bars and N2 is the Number of D2 ( Dai ) Basrs
| Is This Answer Correct ? | 2 Yes | 9 No |
how we can calculate the quantity of sand & cement & also Aggregate so give me to this answer for a slab Length is : 25' /3.28 = 7.62 Mtr Width is : 30' /3.28 = 9.14 Mtr Depth is : 0.6"/3.28 = 0.15 2Mtr
If a 20 years old building without columns was going to renovation having a thickness of walls 12" is it Withstand the load of a new structure of having load of 1150k.g including live&dead loads?
1 Answers Construction, Ryna Facilities Services,
what is water cement ratio in design mix and its percentage in concrete and mortar?
1 Answers Jain Housing, Shivshakti Sugars, Tulip,
which type of instrument included in plumbing work?name of instrument?
How much does the leaning tower of pisa lean?
While casting slab at what length slab casting should be stop
how many binding wire can be required for 1 metric tonne steel?
What are the composition of a landfill?
what is tacheometry?
cement constant for brick works
Project at andheri west mumbai total area of 116000 sq ft near by..Please help me out for quotation plan is ready basic details are with me , please help me out .I will mail u in autocad also.
What is the quantity of cement in mix m20 concrete?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)