Answer / sr sharma
0.08512 bag required for 200mm thick 1 sqm block work by 1:4 cement mortar
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rohit singh
0.20bags cement required for 1 sqm cement mortar
| Is This Answer Correct ? | 0 Yes | 0 No |
how many AAC blocks of size 600*200*225 mm are required for 1 cu.m of area
How to calculate quantity of binding wire for any kind of structures. How to calculate quantity of nails in 1 sq m shuttering.
What is bylayer?
(Project Management Topic) What are the important criteria in the successful realization of the project?
clear cover means the distance between main bar outer face to shuttering face. Is it right?
How much is the curing time period?
How much quantity of coping is done per day by one mason in Rmtr?
why don't we need shear reinforcement in slabs?
Coarse aggregate & fine aggregates are called inert material when used in RCC work because------
WHAT IS THE IMPORTANCE OF FLY ASH BRICK?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)