What are segregation and bleeding?
No Answer is Posted For this Question
Be the First to Post Answer
If in school there are 1800 students and 80 staff how much water can be used by them per day?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
What is the Unit weight of coarse sand (F.M- 2.20) ?????
how to calculate the strength rebound hammer test if average reading of 50.6,50.2,49.1,50.5,50.8,51.7 in grade M-60
WHAT TYPE OF BINDING WIRE IS USED IN OFF SHORE STRUCTURES. WHEATHER COROSIVE OR NON COROSIVE LIKE EPOXY COATED,PLASTIC COATED ETC.
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
What is componsation
0 Answers Nagarjuna Construction,
What is the concepts of buoyancy & effect of weight distribution on floating bodies?
how to calculate the lap bar for bor culvert ?
what the length we reduce for 45deg. bend for each side bend of bar.we know the 2d in case of 90 deg. bend.give clarification also?
In Earth work compaction How u calculate How many liters of water required,for compaction of ordinary soil for one Cu.m.
What are the different types of civil engineering?