12 mm dia not available at site for raft, 10 mm are available at site how to calculate?
Answer Posted / sitaram sharma
Calculate as per following formula.
ND1=ND2
Where N1 is the Number of D1 ( Dai) Bars and N2 is the Number of D2 ( Dai ) Basrs
| Is This Answer Correct ? | 2 Yes | 9 No |
Post New Answer View All Answers
In cement concrete how to check a quality of material also proportion of material at site ?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
What expenses counted in contingencies and how much it is in related to built-up area of the building.
What are the applications of modulus of elasticity?
how much used soil in 1 brick of standard size?
important question on stones
How to increase a bearing capacity of soil?
how many litres of enamel paint required for 5000 sft of site??
What you understand by richter scale?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
What is the general specifications of a bituminous pavement road?
why the openings of sieves are square io size?
how i can tak Quantity of mortar in block work
Which purpose we use deck anchor in bridges?
What is Gsb tollens ?