12 mm dia not available at site for raft, 10 mm are available at site how to calculate?

Answer Posted / sitaram sharma

Calculate as per following formula.


ND1=ND2

Where N1 is the Number of D1 ( Dai) Bars and N2 is the Number of D2 ( Dai ) Basrs

Is This Answer Correct ?    2 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the meaning of 40/20 src

5770


what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing

1880


how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.

1569


Exterior Joints,define

1537


What is bmc stands for in bmc software?

679






How can you achieve soil enforcement?

643


How you read 5x3x1 #4 @ 20" 0/C in steel structure?

1073


what is total volume of ingredients used in concrete accordingly

1812


what is the percentage of silt in black cotton soil.?

1964


how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???

1472


Differentiate orthographic and isometric projections?

652


How to calculate sand , cement quantity for 23mm thk brick work(10x10)

4730


water leak detection system question & answer

1946


What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.

4443


contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?

1899