12 mm dia not available at site for raft, 10 mm are available at site how to calculate?
Answer Posted / sitaram sharma
Calculate as per following formula.
ND1=ND2
Where N1 is the Number of D1 ( Dai) Bars and N2 is the Number of D2 ( Dai ) Basrs
Is This Answer Correct ? | 2 Yes | 9 No |
Post New Answer View All Answers
what is the meaning of 40/20 src
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
Exterior Joints,define
What is bmc stands for in bmc software?
How can you achieve soil enforcement?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
what is total volume of ingredients used in concrete accordingly
what is the percentage of silt in black cotton soil.?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
Differentiate orthographic and isometric projections?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
water leak detection system question & answer
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?