12 mm dia not available at site for raft, 10 mm are available at site how to calculate?
Answer Posted / stejith
dimension of the area not mentioned. or if the weight of 12mm bars are known we can calculate the total 12mm full rod bars needed.
| Is This Answer Correct ? | 3 Yes | 4 No |
Post New Answer View All Answers
What is the meaning of a blue land surveyors flag?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
Which are the top apps for you civil engineering?
sir please send me campus placement questions in civil engineering
What is Rankine Cycle?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
Difference between pre-tensioning and post-tensioning.
How many mortar required for Brickwork of 1 Cu.m works??
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
Define polar co ordinates.
what is the ingredient value of 40mm and 20mm aggregates?
Why steel rods are produced only in even dimensions?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
How many cum of 9.5mm stone in 1 ton ?