12 mm dia not available at site for raft, 10 mm are available at site how to calculate?
Answer Posted / ameen salim
Measurements of slab and spacing of 12mm steel is not Mentioned in your question,
At first you have to calculate area of steel (Ast) designed by the structural engineer for that particular area (from structural drawing you can calculate). Then placed the 10 mm steel instead of 12 mm steel as per Ast you got.
Note:
Adjust the spacing as per Number of steel (10 mm) you have to placed as per calculation.
| Is This Answer Correct ? | 3 Yes | 4 No |
Post New Answer View All Answers
will fix foundation bolts at site with out template is there any procedure?
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
400 ku d/c clearess ketan hota hai?
What is meant by Crystal Concrete?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
What is the crank length in the slab?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
What difference comes in constructing of house and a housing complex like society
i need gate exam civil engineering question papers with answers
Aptitude, reasoning, quants, verbal and technical question
how can we calculate steel value, depending on load
Why reinforcement done in shorter span in two way slabs
reinforcement slab, beam and column formulas?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?