Onsite percentage wastage of Concrete, Rebar, Blockwork/Brickwork, Plaster, Floor tiles ??
Answers were Sorted based on User's Feedback
Answer / sjtbehera
concrete wastage can be taken in to individual i.e
sand-5%. aggregate-5%, rebar-2.5% up to 16mm than 5% above
cement wastage can be taken 5%,
brickwork- 7% can be taken. plaster and floor tiles can be
taken -2.5% of all material.
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / karthik rajendren
3% for Concrete & rebar
5% for Brick/Block Work,Plaster& Tile
| Is This Answer Correct ? | 3 Yes | 0 No |
What is the difference between Fe 500, Fe 500 D and Fe 515.
how to calculate the steel for rcc slab 1100 Square feet
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
If specific gravity of cement is less than 3.15 what is the cause?
List out some of the software program that can be useful for architect?
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
how you calculate the qty. of cement ,sand,aggregate from proportion 1:2:4 M15
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
0 Answers GKC Projects Limited GKCPL,
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
WHAT YOU MEAN BY PROOF STRESS?
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
insted of bentonite we can use any alternate material in piling ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)