Onsite percentage wastage of Concrete, Rebar, Blockwork/Brickwork, Plaster, Floor tiles ??
Answers were Sorted based on User's Feedback
Answer / sjtbehera
concrete wastage can be taken in to individual i.e
sand-5%. aggregate-5%, rebar-2.5% up to 16mm than 5% above
cement wastage can be taken 5%,
brickwork- 7% can be taken. plaster and floor tiles can be
taken -2.5% of all material.
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / karthik rajendren
3% for Concrete & rebar
5% for Brick/Block Work,Plaster& Tile
| Is This Answer Correct ? | 3 Yes | 0 No |
what is difference between fluidity and workability also how palsticizer works
punj loyed and sapurjl palanjl
How to calculate water cement ratio in mix desion
How to estabilish reinforcement Steel rolling margin for a building projects ?
.want to know the volume of water for 1.2.4 concert mixing ratio
How much cost will come for 900 sq ft cement plastering
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
I am a new valuaer. I am seeking for instruments which r used to locate the site and from where I got it?
how to control PQI (Project Quality Index)
Define What are the uses of Groynes?
how to calculate the runner (2*3) qty in cft. the length is 8 feet.
6 Answers CCCL, Gammon, Greenko, L&T,
What are the defects in concrete?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)