Answer / sjtbehera
concrete wastage can be taken in to individual i.e
sand-5%. aggregate-5%, rebar-2.5% up to 16mm than 5% above
cement wastage can be taken 5%,
brickwork- 7% can be taken. plaster and floor tiles can be
taken -2.5% of all material.
Is This Answer Correct ? | 7 Yes | 2 No |
Answer / karthik rajendren
3% for Concrete & rebar
5% for Brick/Block Work,Plaster& Tile
Is This Answer Correct ? | 3 Yes | 0 No |
why cylinder for split tensile strength test ?
what is the meaning of W.T.S this is written on structural Drawing
How to calculate stirrups cutting length in columns
how many BSCs can i connect to the HUAWEI MSC
1:5:10 isme 1 kya h 5 kya h 10 kya h
How to take measurement of plastering beam and column.
What do you mean by TOLERANCE in steel
very simple or less time consuming formula for reinforcement calculation by moment
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
how many types of foundation
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
24. Why should we hire you?